21
Developed 10kVAR class reactive power controller for low voltage system voltage stabilization.
[Period]2018 ~ 2020
[Lead Agency]Korea Electric Power Corporation(KEPCO)
20
Development of Non-corrosive Type PCS for Hydroelectric Solar Power Systems.
[Period]2017 ~ 2019
[Lead Agency]Korea Electric Power Corporation(KEPCO)
19
Research of supplied pv power plant receptivity through proposition of medium, small scale utility PV power plant maintenance guideline.
[Period]2017 ~ 2018
[Lead Agency]Korea Testing Laboratory(KTL)
18
Development of c-Si photovoltaic systems's installation cost saving technologies for achievement of LCOE 0.12$/kWh and demonstration for 100kW class.
[Period]2014 ~ 2017
[Lead Agency]Solar ENS
17
Development of MW-Scale Multi-Central High-Efficiency Inverter System.
[Period]2009 ~ 2012
[Lead Agency]Hex Power System Co., LTD.
16
Developments of Evaluation Criteria and System of Power Module.
(Developments of Evaluation Criteria and System of Power Module for Distributed Power Generation)
[Period]2008 ~ 2010
[Lead Agency]COSAR / LSIS Co., LTD.
15
Development of Intelligent Protection and Control Algorithms for IDE to the Grid-tied Distributed Power.
[Period]2005 ~ 2008
[Lead Agency]Korea Electrotechnology Research Institute (KERI)
14
Field Demonstration Studies of 100kWp Photovoltaic System of Tibetan areas in China.
[Period]2004 ~ 2007
[Lead Agency]Korea Energy Management Corporation (KEMCO)
13
Developments of the Distributed placement type Grid-tied MW class PV systems and Components Technology.
[Period]2004 ~ 2010
[Lead Agency]Korea Energy Management Corporation (KEMCO)
12
120kW class PV system applications and assessment of the Grid-tied operation.
[Period]2004 ~ 2006
[Lead Agency]Korea Electric Power Research Institute (KEPRI)
11
Developments of the commercialization technology of 3kW Grid-tied PV system and the mass production technology of PV cell for House-diffusion.
[Period]2002 ~ 2004
[Lead Agency]Korea Energy Management Corporation (KEMCO)
10
Development of the Startup-Resistor by using Converter Control.
[Period]2002 ~ 2003
[Lead Agency]Small & Medium Business Administration (SMBA)
9
A study on th Evaluate the operation of residential PV systems and practical deployment plan.
[Period]2001 ~ 2003
[Lead Agency]Korea Electric Power Research Institute (KEPRI)
8
Field Demonstration Studies of 3kW PV System and Solar Water Heaters for Residential.
[Period]2001 ~ 2002
[Lead Agency]Korea Energy Management Corporation (KEMCO)
7
Development of the Soft-Switching Power Supply Adopted the High-density Mount Technology to the On-Board.
[Period]2001 ~ 2002
[Lead Agency]Korea Testing Laboratory(KTL)
6
Development of the Charge-Controller for PV.
[Period]2001 ~ 2002
[Lead Agency]Small & Medium Business Administration (SMBA)
5
Development of the SMPS for IS5 Medium capacity Inverter.
[Period]2000 ~ 2000
[Lead Agency]R&D Center of LSIS Co., LTD.
4
A Study on the Establish Test Ccriteria for Relays.
[Period]2000 ~ 2002
[Lead Agency]Korea Electric Power Research Institute (KEPRI)
3
Study on operation evaluation and practical application of photovoltaic system for residential use.
[Period]2000 ~ 2003
[Lead Agency]Korea Electric Power Corporation(KEPCO)
2
Analysis on the electric apparatus for 200kW class fuel cell power system.
[Period]1999 ~ 1999
[Lead Agency]Korea Gas Corporation
1
Development of the DC/DC Converter for KTX Lighting.
[Period]1999 ~ 1999
[Lead Agency]Hyundai Rotem (KOROS) / SAMKONG ELECTRIC CO.